Bethel High School Wetland Modeling
Location: Graham, WA
Category: Wetland Mitigation
Client: Bethel High School/Sitts and Hill Engineering
Project Description
Clear Creek Solutions conducted modeling of the 12 wetlands present on the proposed Bethel High School site. Wetland fluctuation volumes were calculated based on purposed impervious areas and drainage conditions. Public testimony was required to explain the proposed design measures.
Clear Creek Solutions worked in coordination with Sitts and Hill Engineering to develop an effective stormwater mitigation and treatment plan while maintaining the integrity of the surrounding wetlands.
Expert testimony was provided by Doug Beyerlein regarding the mitigation measures and their validity and feasibility.
Tasks Accomplished
-
The 12 existing wetlands were modeled and soil conditions were identified.
#1
-
The volume fluctations were determined for each mitigation measure and proposed facilities were modeled.
#2
-
Testimony was provided to outline the mitigation measures and give the public sufficient transparency.
#3
Contact us.
Support: Support@clearcreeksolutions.com
Joseph T. Brascher Sr.: Brascher@clearcreeksolutions.com
Douglas Beyerlein P.E.: Beyerlein@clearcreeksolutions.com
Joseph Brascher Jr. EIT.: BrascherJr@ClearCreekSolutions.com
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste. F
Olympia, WA 98501
360-943-0304
Clear Creek Solutions, Inc.
15800 Village Green Drive #3
Mill Creek, WA 98012
425-225-5997