HSPF Watershed Calibration Clark County, WA

Client: Clark County Public Works, Vancouver, WA

Clark County contracted with Otak to update the County's stormwater ordinance. Clear Creek Solutions was hired to produce HSPF calibrations of two watersheds in the county.

The calibrated HSPF parameter values were then used to update the Western Washington Hydrology Model (WWHM) for Clark County.

In order to use HSPF as the hydrologic stormwater engine for WWHM, it must be calibrated to watersheds that reflect the range of climatic, topographic, soil, and land use conditions within Clark County.

Process and Solution

In this study, model simulations were performed for the Mill Creek and Gee Creek watersheds.

Topographic, soils, and land use/cover information was used to develop the model segmentation and parameter inputs for the watershed models.

Both quantitative and qualitative comparisons were performed to support the model performance evaluation effort.

Model Results

Based on the model results, the HSPF application to the Mill Creek and Gee Creek watersheds provide a sound, calibrated and validated HSPF parameter values for Clark County.

The resulting model parameter values are appropriate for use in WWHM-SWMM, and for impact evaluation of flood control alternatives to meet the Washington State Department of Ecology's requirements.

The calibration results, based on the weight-of-evidence approach described herein, demonstrate a good representation of the observed data.

This is the outcome of a wide range of graphical comparisons and measures of model performance for flow duration and individual storm event simulations.

These comparisons demonstrate conclusively that the models are a good representation of the water balance and hydrology of the watersheds.

New HSPF pervious land segments (PERLNDs) and calibrated parameter values replaced the standard PERLNDs and values used in WWHM-SWMM for Clark County in support of the County's updated stormwater ordinance.

Our Projects

Land Development Stormwater Analysis
Land Development Stormwater Analysis

A private client contracted with Clear Creek Solutions to investigate potential downstream flooding in conjunction with a proposed land development in Western Washington. The development will be constructed to provide direct discharge from the project site through a tide gate to Puget Sound.

Government Canal Stormwater Analysis Study
Government Canal Stormwater Analysis Study

The City of Pacific contracted Clear Creek Solutions as the stormwater modeling subconsultant to find a pump solution to alleviate flooding in and around the Government Canal.

Monte Villa Parkway Drainage Study
Monte Villa Parkway Drainage Study

The City of Bothell contracted Clear Creek Solutions to investigate the observed street and private property drainage problems along 35th Avenue SE between 228th Street SE and 240th Street SE and south of 240th Street SE to Monte Villa Parkway.

Yauger Park Regional Stormwater Facility Expansion
Yauger Park Regional Stormwater Facility Expansion

Clear Creek Solutions (CCS) and Davido Consulting Group (DCG) were selected by the City of Olympia to assist in the proposed expansion of a joint-use recreation and stormwater flow control facility.

Hydrologic And Hydraulic Modeling Of The Yauger Park Drainage Basin
Hydrologic And Hydraulic Modeling Of The Yauger Park Drainage Basin

The City of Olympia contracted with Clear Creek Solutions to provide hydrologic and hydraulic modeling services. Our solutions were successful in reducing flooding in the Yauger Park drainage system caused by large events like the December 2007 flood.

Edwards Aquifer Recharge Modeling
Edwards Aquifer Recharge Modeling

Comparative analyses were made to determine the preferred precipitation data set for the model.

Costco Stormwater Facility Sizing
Costco Stormwater Facility Sizing

Costco's development of a new store in south Snohomish County, just north of Woodinville, required innovative strategies and analysis to protect adjacent Little Bear Creek.

HSPF Watershed Calibration Clark County, WA
HSPF Watershed Calibration Clark County, WA

Clark County contracted with Otak to update the County's stormwater ordinance. Clear Creek Solutions was hired to produce HSPF calibrations of two watersheds in the county.

Olympia Sea Level Rise Modeling
Olympia Sea Level Rise Modeling

Clear Creek Solutions constructed a WWHM-SWMM model of the City of Olympia drainage systems impacted by a rise in sea levels and associated Puget Sound high tides.

TOP