Costco Stormwater Facility Sizing

Client: Costco Wholesale, Issaquah, WA

Costco's development of a new store in south Snohomish County, just north of Woodinville, required innovative strategies and analysis to protect adjacent Little Bear Creek.

The Costco underground stormwater storage facilities reduce peak flows in Little Bear Creek.

Problem

The Costco store site is located on 14.38 acres between SR 522 and Highway 9. An additional 2.35 acres of Highway 9 improvements were planned along the store's frontage.

Drainage from the site crosses SR 522 in WSDOT culverts and enters Little Bear Creek.

The WSDOT permit required the Costco stormwater system to meet Department of Ecology flow control standards.

Process and Solution

Clear Creek Solutions used WWHM-SWMM to size the two stormwater systems for Costco.

On-site stormwater runoff (from the store and parking lot drainage) are routed to an underground storage facility consisting of 5240 linear feet of 96-inch diameter pipe (6.04 ac-ft of storage).

The runoff from off-site Highway 9 improvements are directed to a separate underground storage system with 1140 linear feet of 96-inch pipe (1.31 ac-ft of storage).

Both systems include 6 inches of dead storage for initial water quality treatment.

Additional water quality treatment will be provided by Stormwater Management, Inc.'s Stormfilter units.

The stormwater runoff impact to Little Bear Creek was analyzed using HSPF and the Little Bear Creek watershed model we developed for King County.

The proposed Costco land use conditions were modeled and compared with existing land use (a warehouse facility and adjacent gravel auto yard).

Result

Stormwater runoff is reduced from 23 cfs to less than 1 cfs for the 100-year flood.

Little Bear Creek peak flows are reduced by approximately 1%.

Our Projects

Land Development Stormwater Analysis
Land Development Stormwater Analysis

A private client contracted with Clear Creek Solutions to investigate potential downstream flooding in conjunction with a proposed land development in Western Washington. The development will be constructed to provide direct discharge from the project site through a tide gate to Puget Sound.

Government Canal Stormwater Analysis Study
Government Canal Stormwater Analysis Study

The City of Pacific contracted Clear Creek Solutions as the stormwater modeling subconsultant to find a pump solution to alleviate flooding in and around the Government Canal.

Monte Villa Parkway Drainage Study
Monte Villa Parkway Drainage Study

The City of Bothell contracted Clear Creek Solutions to investigate the observed street and private property drainage problems along 35th Avenue SE between 228th Street SE and 240th Street SE and south of 240th Street SE to Monte Villa Parkway.

Yauger Park Regional Stormwater Facility Expansion
Yauger Park Regional Stormwater Facility Expansion

Clear Creek Solutions (CCS) and Davido Consulting Group (DCG) were selected by the City of Olympia to assist in the proposed expansion of a joint-use recreation and stormwater flow control facility.

Hydrologic And Hydraulic Modeling Of The Yauger Park Drainage Basin
Hydrologic And Hydraulic Modeling Of The Yauger Park Drainage Basin

The City of Olympia contracted with Clear Creek Solutions to provide hydrologic and hydraulic modeling services. Our solutions were successful in reducing flooding in the Yauger Park drainage system caused by large events like the December 2007 flood.

Edwards Aquifer Recharge Modeling
Edwards Aquifer Recharge Modeling

Comparative analyses were made to determine the preferred precipitation data set for the model.

Costco Stormwater Facility Sizing
Costco Stormwater Facility Sizing

Costco's development of a new store in south Snohomish County, just north of Woodinville, required innovative strategies and analysis to protect adjacent Little Bear Creek.

HSPF Watershed Calibration Clark County, WA
HSPF Watershed Calibration Clark County, WA

Clark County contracted with Otak to update the County's stormwater ordinance. Clear Creek Solutions was hired to produce HSPF calibrations of two watersheds in the county.

Olympia Sea Level Rise Modeling
Olympia Sea Level Rise Modeling

Clear Creek Solutions constructed a WWHM-SWMM model of the City of Olympia drainage systems impacted by a rise in sea levels and associated Puget Sound high tides.

TOP